![]() |
![]() |
![]() |

5. Shickel Corp of Bridgewater inserted I beams thru the 4 holes and welded the horizontal beam in place to support them. This structure and a similar one inside, held the upper brick wall in place while the lower cracked part was removed.
Page: 5 of 30 (16%)